Remote-reading hot water meters by the end of 2026
What the law requires
Under § 75 of the Transitional and Final Provisions of the Act amending the Energy Efficiency Act (State Gazette No. 21 of 2021), in connection with Art. 140(1) and (7)–(8) of the Energy Act, hot water meters in condominium buildings connected to the district heating network must allow remote reading.
The deadline is 1 January 2027.
What you need to do
If the hot water meters in your property are not read remotely, request a replacement or installation of remote-reading meters in good time.
Fill in the request below and we will contact you to clarify the type of meters and the installation conditions.
What Dalsia does
- Site visit and an individual offer based on the meter type and installation conditions
- Supply of the meters
- Installation, arranged once the request is confirmed
- Reading through the Dalsia system
Where
Sofia, Plovdiv, Ruse and Razgrad. If your property is elsewhere, choose “Other” in the request.
Request a meter replacement
The price is individual, based on the meter type and the installation conditions.
The legal deadline is 1 January 2027.
Frequently asked questions
Hot water meters must allow remote reading by 1 January 2027 (§ 75 of the Transitional and Final Provisions of the Act amending the Energy Efficiency Act, State Gazette No. 21/2021).
After 1 January 2027, a hot water meter without remote reading does not meet the legal requirement. How this affects the allocation of heat energy is governed by the Energy Act (Art. 140). Contact us about your specific case.
The price is individual and depends on the meter type and the installation conditions. After your request we will contact you with an offer.
Installation is arranged once the request is confirmed. You can state a preferred period in the request.
Meter replacement request
Fill in the form and we will contact you to clarify the type of meters, the installation conditions and the offer.
